Skip to content

Commercial

Logistics Hub Rooftop Array

A 4.8 MWp Commercial project in Hamburg, Germany — engineered, delivered and operated by Oakridge.

Location
Hamburg, Germany
Capacity
4.8 MWp
Annual output
4,500 MWh
CO₂ avoided / yr
1,900 t
Completed
2025

This project illustrates Oakridge’s end-to-end delivery: from feasibility and yield modelling to installation, grid connection and long-term operation. Replace this text in the admin panel with the real case-study details, client outcomes and imagery.

Let’s talk

Ready to switch on?

Book a free feasibility consultation. We’ll model your yield, savings and payback — with no obligation.