Skip to content

Storage

Manufacturing Plant Storage Retrofit

A 3.2 MWh BESS Storage project in Stuttgart, Germany — engineered, delivered and operated by Oakridge.

Location
Stuttgart, Germany
Capacity
3.2 MWh BESS
Annual output
−38% peak load
CO₂ avoided / yr
640 t
Completed
2025

This project illustrates Oakridge’s end-to-end delivery: from feasibility and yield modelling to installation, grid connection and long-term operation. Replace this text in the admin panel with the real case-study details, client outcomes and imagery.

Let’s talk

Ready to switch on?

Book a free feasibility consultation. We’ll model your yield, savings and payback — with no obligation.