Skip to content

Industrial

Distribution Centre Hybrid System

A 2.6 MWp + 1.5 MWh Industrial project in Rotterdam, Netherlands — engineered, delivered and operated by Oakridge.

Location
Rotterdam, Netherlands
Capacity
2.6 MWp + 1.5 MWh
Annual output
2,400 MWh
CO₂ avoided / yr
1,000 t
Completed
2026

This project illustrates Oakridge’s end-to-end delivery: from feasibility and yield modelling to installation, grid connection and long-term operation. Replace this text in the admin panel with the real case-study details, client outcomes and imagery.

Let’s talk

Ready to switch on?

Book a free feasibility consultation. We’ll model your yield, savings and payback — with no obligation.